top of page
Writer's pictureJohn Blake

Lane over Cape Fear Bridge at ETown to have “brief closures”

Note: This was just announced Monday, Oct 10th.


"Update – When asked for a schedule for the closures, Andrew Barksdale with NCDOT stated, “There are no set times on when these 2-minute closures will occur. They will happen sometime in the morning, and again after lunch – could be 2 or 3 times in the morning and a similar number in the afternoon. Each closure will last about 2 minutes. The girders are quite large, and it’s not possible to haul them from one side of the bridge to another without encroaching into more than one lane.”


What we can tell from the article, one lane will be used by bridge contractors, not not on a schedule, just when ever they want to use the road to do the girder work. ---Leave home a few minutes earlier than normal to allow for 2 minutes or 4 minutes or whatever amount of time the crew needs the lane, to arrive at Vineyard Golf, White Lake on October 11, 2022.


To read the entire article this is the link to our Source: https://bladenonline.com/major-bladen-county-bridge-requires-brief-closures/

38 views1 comment

1 Comment


xxcessus
xxcessus
Oct 11, 2022

Thank you John !😎👍🏌️‍♂️🏌️‍♂️

Like
bottom of page